Bando 5BX59 Power King Cog, BXM59 Programmers - Testers

Regular price $ 121.88
Tax included. Shipping calculated at checkout.
Description

Bando 5BX59 Power King Cog, BXM59 Programmers - TestersBando 5BX59 Studies have determined that using Bando Power King Cog V belts can save substantial dollars on energy consumption. The precision molded raw edge cogged construction transfers power with much greater efficiency, allowing for smaller sheave sizes and increased power transmission capabilities. The bias cut cover stock provides lateral stability across the width of the belt while allowing axial flexibility. Stability is assured through the

38 IN Power Factor 85 Product Family General Purpose Pulley End Bearing Type Ball Pulley Face Code C-Face Pulley Shaft Indicator Tapped & Key Rodent Screen None Service Factor 1

Packard - PF90501

12-0000-0420 HP 50 RPM 1770 VOLT 460 AMP 57 RATING 40C AMB-CONT NEMA-NOM-EFF 94

875 IN Shaft Extension Location Pulley End Shaft Ground Indicator No Shaft Grounding Shaft Rotation Reversible Shaft Slinger Indicator Shaft Slinger Speed 1760 rpm Speed Code Single Speed Motor Standards NEMA Starting Method Wye Start - Delta Run Thermal Device - Bearing None Thermal Device - Winding None Vibration Sensor Indicator No Vibration Sensor Winding Thermal 1 None Winding Thermal 2 None Drawings

Model CFDB2-10-2984 Power 2

Amperes 2144 A LRC 8

Load 52° C Start Configuration DOL Break-Down Torque 3

479 Line Amps 4

1x(Code J) No load current 71

0 a Front Face Code Standard Front Shaft Indicator None Heater Indicator No Heater Insulation Class F Inverter Code Inverter Ready KVA Code G Lifting Lugs Standard Lifting Lugs Locked Bearing Indicator Locked Bearing Motor Lead Exit Ko Box Motor Lead Termination Flying Leads Motor Lead Quantity/Wire Size 6 @ 4 AWG Motor Type 4488M Mounting Arrangement F1 Number of Poles 4 Overall Length 34

Amperes 1755 A LRC 6

Catalog Number VECP83584T-4 Enclosure TEFC Frame 145TC Frame Material Iron Frequency 60

Easy Shipping

Quick Dispatch:

Your Bando 5BX59 Power King Cog, BXM59 Programmers - Testers orders ship within 1-2 business days.

Delivery Options:

  • Standard: 3-7 business days
  • Fast: 2-3 business days
  • Express: 1-2 business days

Order Tracking:

You'll receive a tracking link by email once your Bando 5BX59 Power King Cog, BXM59 Programmers - Testers ships.

Need Help?
Questions about Bando 5BX59 Power King Cog, BXM59 Programmers - Testers, sizing, or delivery? We're just an email away.

Live Shipping Estimates:
Enter your location at checkout to see available shipping methods and costs for Bando 5BX59 Power King Cog, BXM59 Programmers - Testers in your area.

Get Shipping Estimates

You may also like

recommand products

{{{showcase_5_name}}}

US$ {{{showcase_5_price}}}

Min. order: 1 piece

{{{showcase_5_star}}} ({{{showcase_5_reviews}}} reviews)

Sold : Login>>

{{{showcase_6_name}}}

US$ {{{showcase_6_price}}}

Min. order: 1 piece

{{{showcase_6_star}}} ({{{showcase_6_reviews}}} reviews)

Sold : Login>>

{{{showcase_7_name}}}

US$ {{{showcase_7_price}}}

Min. order: 1 piece

{{{showcase_7_star}}} ({{{showcase_7_reviews}}} reviews)

Sold : Login>>

{{{showcase_8_name}}}

US$ {{{showcase_8_price}}}

Min. order: 1 piece

{{{showcase_8_star}}} ({{{showcase_8_reviews}}} reviews)

Sold : Login>>

{{{showcase_9_name}}}

US$ {{{showcase_9_price}}}

Min. order: 1 piece

{{{showcase_9_star}}} ({{{showcase_9_reviews}}} reviews)

Sold : Login>>

{{{showcase_10_name}}}

US$ {{{showcase_10_price}}}

Min. order: 1 piece

{{{showcase_10_star}}} ({{{showcase_10_reviews}}} reviews)

Sold : Login>>